Masaganang Agrikultura, Maunlad na Ekonomiya!

SH-025-17 Supply and Delivery of Furniture and Fixtures for 2nd Quarter (SAAD)

Author: DA-BAC | 3 April 2017

April 03, 2017

 

REQUEST FOR QUOTATION

            SHOPPING

INSTRUCTIONS:

 

  1. Bidders are required to read the instructions and fill all the blanks properly, particularly the column under the offered brand. Non- indication of the offered brand shall be construed as offering the specifications as required in the RFQ.
  2. The Bidders/Suppliers may submit alternate offer provided that the DA-BAC’s official canvass form shall be filled up (with the offered brand, unit price and total price), signed properly and attached together with the Bidder’s/Supplier’s own canvass form.

Please write legibly, non-compliance of which shall result to the automatic disqualification of proposal.

  1. Specifications herein provided are the minimum requirements of the DA. Hence a bidder must not offer lower specifications than required.
  2. Quotation/s must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.
  3. Price quotation(s) submitted shall be valid for a period of THIRTY (30) days reckoned from the deadline for submission of quotations as reflected in the PhilGEPS.
  4. Terms of Payment within – Thirty (30) days from delivery of item/s.
  5. Quotation(s)/ Proposal(s) shall be submitted to the Office of the Procurement Division, at the 2nd Floor, ITCAF Building, Elliptical Road, Diliman Quezon City.
  6. Only sealed canvasses shall be considered by the BAC­
  7. The bidder is required to affix his/her signature across the flap of the sealed envelope, non-compliance of which shall result to the automatic disqualification of proposal.
  8. Awarding shall be done by
  9. DEADLINE FOR SUBMISSION OF BIDS: April 06, 2017 12:00 noon.
  10. Delivery Period: Seven (7) working days upon receipt of approved Purchase Order/Work Order.
  11. Effectivity Period: Upon conforme of approved Purchase Order/Work Order
  12. Availability of Stocks: 60 days reckoned from instruction no. 12.
  13. Mandatory Requirements: (Certified True Copies of Valid Mayor’s Permit and BIR Certificate of Registration). The proposal shall be accompanied by the aforementioned documents, otherwise, non-submission of which shall result to automatic disqualification of proposal.
  14. Validity of Price: 30 days
  15. The bidders shall reflect on the envelope the Solicitation no. and the PR/PRAS no., the BAC shall not be responsible on the pre-emptive/premature opening of the proposal.
  16. Manufacturers, suppliers, distributors, contractors, and/or consultants are mandated to register with the PhilGEPS and provide a PhilGEPS Registration number as a condition for award of the contract.

 

  PRAS NO. 17-0652                                ABC: 546,560.00                                       End – user:  SAAD

   Resolution No.    Solicitation No. SH-025-17

Qty Unit ITEM/DESCRIPTION UNIT

COST

OFFERED BRAND UNIT PRICE TOTAL PRICE
    SUPPLY AND DELIVERY OF FURNITURE AND FIXTURES

FOR 2ND QUARTER

       
23 piece ITEM I: TABLE

(120W x 70D x 74Hcm Main table-off white top and legs 1 fixed pedestal Off-white (flush handle) CSL drawer beige

P10,120.00

 

 

     
23 piece ITEM II: CHAIR HIGH BACK MESH CHAIR
Backrest: Mesh/Chair
Seatrest: Customized Leatherette
4,950.00      
5 piece ITEM III: FILING CABINET

powder coated steel

Measurements: W80xD40XH115cm

10,000.00      
5 piece ITEM IV: GLASS SLIDING DOOR CABINET (2 layer)

W90xD45xH74cm

Color: Beige

11,550.00      
5 piece ITEM V: LATERAL CABINET (3 layer)

W90xD45xH106cm

all metal construction steel bearing gauge 0.9mm or gauge 20 with file divider central locking system

12,500.00      
2 piece ITEM VI: OFFICE SOFA LEATHERETTE

3 seater

14,850.00      
    GRAND TOTAL Php546,560.00      

 

For the Bids and Awards Committee:

 

_____________________                                                     _________________________

               PhilGEPS Posted                                                               ATTY. MELINDA D. DEYTO

                                                                                                                    Chief, Procurement Division

_______________________

                          Canvasser

 

The DA Bids and Awards Committee (BAC)

Elliptical Rd., Diliman Quezon City

 

SIR/MADAM:

 

In connection with the above request, I/We submit your quotation indicated above.  I/We have carefully read and fully understand the minimum requirements and agree to furnish and/or delivery in conformity with specifications any or all said articles described above within seven (7) working days from receipt of Purchase Order.

 

_____________________              _____________________      _____________________

Signature Over Printed Name                         Name of Company                      Tax Identification Number

 

______________________             ___________________            _____________________

Telephone Number(s)                                      Address                                               Date Accomplished

 

PhilGEPS Reg. No:  
Bank Details:  
Name of Bank (Branch):  
Account Name:  
Account Number:  

 

E-mail Address of the Bidder: ______________________________
Back to Archives