REQUEST FOR QUOTATION

  1. SH-020-19

 

 

  1. MANDATORY REQUIREMENTS

 

  1. Submission of documentary requirements with mark “ü” as follows:

 

Mayor’s/Business Permit
Valid PhilGEPS Registration Number

 

NOTE: PhilGEPS Certificate of Platinum Membership may be submitted in lieu of Mayor’s

Permit and PhilGEPS Registration Number.

 

  1. The Bidders/Suppliers or their Authorized Representative shall accomplish this form including unit price and total price as well as sub-total and grand total (if applicable) and affix their signature over printed name indicated in the lower portion of this form.
  2. Please write legibly.

 

  1. INSTRUCTIONS:

 

  1. Only sealed canvass shall be considered by the BAC. The Bidders/ Suppliers shall reflect on the envelope the RFQ Number and the PRAS No., the BAC shall not be responsible on the pre-emptive/ premature opening of the proposal.
  2. Any interlineations, erasures or overwriting shall be valid only if they are signed or initialed by the Bidders/Suppliers or their Authorized Representative.
  3. Quotation(s) must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.
  4. Price quotation(s) submitted shall be valid for a period of ONE HUNDRED TWENTY (120) days reckoned from the deadline for submissions of quotations as reflected in this form.
  5. Terms of Payment: Thirty (30) days from delivery of item(s).
  6. Quotation(s)/Proposal(s) shall be submitted to and received by the Office of the Procurement Division, at the 2nd Floor, ICTS Building, Elliptical Road, Diliman, Quezon City on or before the time and date stated in no.8.
  7. Awarding shall be done by
  8. DEADLINE FOR SUBMISSION OF BIDS: September 12, 2019 at 12:00 noon
  9. In case of two or more bidders are determined to have submitted the Lowest Calculated Quotation/Lowest Calculated and Responsive Quotation, the BAC shall employ “draw lots” as the tie-breaking method to finally determine the single winning provider in accordance with GPPB Circular No. 06-2005.
  10. Delivery Period or Installation Period: within fourteen (14) Calendar Days upon receipt of Work / Purchase Order.
  11. The Uniform Guidelines for Blacklisting set forth in Appendix 17 of the 2016 Revised IRR of RA 9184 shall apply in case any of the violations listed under Item Nos. 4.1 and 4.2 thereof is/are committed.
  12. The Department of Agriculture reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the affected bidder or bidders.

 

PRAS NO. 19-1770                                                ABC: PHP57,796.00                            END-USER: GSD

                                                           Mode of Procurement:  Shopping   SH-020-19

 

QTY UNIT ITEM/DESCRIPTION CEILING FOR

TOTAL  PRICES

(PhP)

UNIT PRICE

 

(PhP)

TOTAL  PRICE

 

(PhP)

    SUPPLY AND DELIVERY OF HARDWARE SUPPLIES      
12 gallons Flat Latex Paint PhP8,640.00    
8 gallons Gloss Latex Paint 6,000.00    
30 pcs Sanding Paper #120 600.00    
2 Galloons Flat Wall Enamel-White 1,300.00    
2 Galloons Quick Dry Enamel -White 1,340.00    
1 Gal. Paint Thinner 450.00    
2 Pcs. Baby Roller 156.00    
2 Pcs Paint Brush 1” 150.00    
1 Quart Acri Color Black 230.00    
1 Quart Acri Color-Blue 250.00    
1 Quart Acri Color-Hanza Yellow 280.00    
1 Quart ¼ Tinting Color-Black 160.00    
1 Quart ¼ Tinting Color-Blue 180.00    
1 Quart ¼ Tinting Color-Hanza Yellow 215.00    
18 Pcs. Narra Play ¼ x 4/8 26,100.00    
15 Pcs. Cornesa 3” x 10 PT with Paint 5,400.00    
1 Kilo Common Nail 1” 100.00    
3 gallons Sanding Sealer 2,220.00    

 


3 Gallons Clear Gloss Laquer 2,250.00    
1 Gallon Lacquer Flor 770.00    
2 Gallons Lacquer Thinner 900.00    
3 Kilos Rags 105.00    
    Total PhP57,796.00    

 

 

Please see attached link for the Request for Quotation.

 

https://drive.google.com/open?id=1_u_0-WY4xr-Tcc-mWkK4SSCaL2cVXR85

 

 

 

 

 

 

                                                                 (Original Signed)

                                                                                                                _____________________________

                                                                                                                             ATTY. MELINDA  D. DEYTO

                                                                                                                               Chief, Procurement Division

 

 

 

 

 

SIR/MADAM:

 

                In connection with the above requirement(s), I/We submit our quotation/proposal indicated above. I/We carefully read and fully understand the minimum requirements and agree to furnish and/or deliver the abovementioned requirement(s) in conformity with the specifications/terms of reference indicated/attached hereto.

 

 

 

Signature Over Printed Name

 

 

Name of Bidder

 

 

PhilGEPS Registration Number

 

 

Contact Number(s)

 

 

Office Address

 

 

Email Address of the Bidder

(Optional)

 

 

Terms of Payment:

 

Payment shall be made through Land Bank’s LDDAP-ADA/Bank Transfer. Bank Transfer Fee shall be charged against the creditor’s account.

 

Payment Details:

 

Banking Institution: _____________________________

 

aaAccount Number: _____________________________

 

aaAccount Name: _____________________________

 

a Branch: _____________________________

 

 

 

 

PD/lsm

 

_____________________________

In lieu of the Mayor’s Permit, only the BIR Certificate shall be submitted by an individual supplier/contractor/ service provider. 

 