Masaganang Agrikultura, Maunlad na Ekonomiya!

NP-052-19: Supply, Delivery including Labor for the Pull Down Cylinder Head Assy. Perform Top Overhauling of Kia Sorento with Plate No. ZLP-467 (GSD)

Author: DA-BAC | 27 June 2019

27 June 2019

 

REQUEST FOR QUOTATION

  1. NP-052-19

 

 

  1. MANDATORY REQUIREMENTS

 

  1. Submission of documentary requirements with mark “ü” as follows:

 

Mayor’s/Business Permit[1]
Professional License/Curriculum Vitae (Consulting Services)
Valid PhilGEPS Registration Number
PCAB License (Infrastructure Projects)
Income Tax/Business Tax Return (For ABCs above PhP500,000.00)
Omnibus Sworn Statement (For ABCs above PhP50,000.00)[2]
Performance Security for Infrastructure Projects

 

NOTE: PhilGEPS Certificate of Platinum Membership may be submitted in lieu of Mayor’s

Permit and PhilGEPS Registration Number.

 

  1. The Bidders/Suppliers or their Authorized Representative shall accomplish this form including unit price and total price as well as sub-total and grand total (if applicable) and affix their signature over printed name indicated in the lower portion of this form.

 

  1. Please write legibly.

 

 

  1. INSTRUCTIONS:

 

  1. Open quotations may be submitted at the office address indicated below. In case of sealed quotation, the Bidders/Suppliers or their Authorized Representative shall indicated on the envelope the RFQ number and the name of bidder/supplier. Otherwise, the quotation shall be rejected.

 

  1. Any interlineations, erasures or overwriting shall be valid only if they are signed or initialed by the Bidders/Suppliers or their Authorized Representative.

 

  1. Quotation(s) must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.

 

  1. Price quotation(s) submitted shall be valid for a period of ONE HUNDRED TWENTY (120) days reckoned from the deadline for submissions of quotations as reflected in this form.

 

  1. Terms of Payment: Thirty (30) days from delivery of item(s).

 

  1. Quotation(s)/Proposal(s) shall be submitted to and received by the Office of the Procurement Division, at the 2nd Floor, ICTS Building, Elliptical Road, Diliman, Quezon City on or before the time and date stated in no.8.

 

  1. Awarding shall be done by LOT

 

  1. DEADLINE FOR SUBMISSION OF BIDS: JULY 01, 2019 at 12:00 noon

 

  1. In case of two or more bidders are determined to have submitted the Lowest Calculated Quotation/Lowest Calculated and Responsive Quotation, the BAC shall employ “draw lots” as the tie-breaking method to finally determine the single winning provider in accordance with GPPB Circular No. 06-2005.

 

  1. Delivery/Installation Period: within fourteen (14) calendar days upon receipt of Work Order.

 

  1. The Uniform Guidelines for Blacklisting set forth in Appendix 17 of the 2016 Revised IRR of RA 9184 shall apply in case any of the violations listed under Item Nos. 4.1 and 4.2 thereof is/are committed.

 

  1. The Department of Agriculture reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the affected bidder or bidders.

 

  1. Warranty Security (3 Months Warranty)
  2. The warranty shall be covered by a retention money in an amount equivalent to at least one percent (1%) but not to exceed five percent (5%) of every progress payment unless a special bank guarantee equivalent to at least one percent (1%) but not to exceed five percent (5%) of every progress payment of the total Contract Price, is submitted together with this RFQ.

 

PRAS NO. 19-0592                                           ABC: PHP72,050.00                                           END-USER: GSD

Mode of Procurement: Small Value Procurement (SVP)

 

QTY UNIT ITEM/DESCRIPTION CEILING FOR BID PRICES

(PhP)

BID PRICE PER ITEM

(PhP)

TOTAL BID PRICE

(PhP)

SUPPLY, DELIVERY INCLUDING LABOR FOR THE PULL DOWN CYLINDER HEAD ASSY. PERFORM TOP OVERHAULING OF KIA SORENTO WITH PLATE NO. ZLP-467      
1 lot Labor: Pull Down Cylinder Head; Eliminate Engine Leak; Tune Up & Change Oil; Rep. Shock Absorber, Balljoint and Tie Rod End 15,000.00    
1 lot Machine Shop including Press in and out 8,500.00    

 

1 set Overhauling Gasket 10,500.00    
7 liters Engine Oil 2,450.00    
1 set Engine Valve Intake & Exhaust 6,500.00    

 

1 set Valve Seal 1,800.00    
4 pcs Shock Absorber Front & Rear 14,000.00    
4 pcs Balljoint Upper & Lower 6,000.00    
2 pcs Tie Rod End 1,500.00    
1 pc Drive Belt 2,500.00    
1 pc Tensioner Adjuster 1,500.00    
1 lot Wheel Alignment 1,800.00    
    TOTAL AMOUNT 72,050.00    

 

 

 

                                                                                     

                                                                                   

                                                                                                 ATTY. MICHAEL S. ANDAYOG

                                                                                                   Chairperson, BAC-Secretariat

 

 

 

 

SIR/MADAM:

 

            In connection with the above requirement(s), I/We submit our quotation/proposal indicated above. I/We carefully read and fully understand the minimum requirements and agree to furnish and/or deliver the abovementioned requirement(s) in conformity with the specifications/terms of reference indicated/attached hereto.

 

 

 

 

Signature Over Printed Name

 

 

Name of Bidder

 

 

PhilGEPS Registration Number

 

 

Contact Number(s)

 

 

Office Address

 

 

Email Address of the Bidder

(Optional)

 

 

 

Terms of Payment:

 

Payment shall be made through Land Bank’s LDDAP-ADA/Bank Transfer. Bank Transfer Fee shall be charged against the creditor’s account.

 

Payment Details:

 

Banking Institution: ______________________________________________

 

aaAccount Number: ______________________________________________

 

aaAccount Name: ______________________________________________

 

a Branch: ______________________________________________

 

 

 

                                                                             

[1] In lieu of the Mayor’s Permit, only the BIR Certificate shall be submitted by an individual supplier/contractor/ service provider.

[2]The submission of Omnibus Sworn Statement shall be required from the winning bidder prior to payment.

***PhilGEPS Certificate of Platinum Membership may be submitted in lieu of Mayor’s Permit and PhilGEPS Registration Number

Back to Archives