March 28, 2017
REQUEST FOR QUOTATION
NEGOTIATED PROCUREMENT
INSTRUCTIONS:
- Bidders are required to read the instructions and fill all the blanks properly, particularly the column under the offered brand. Non- indication of the offered brand shall be construed as offering the specifications as required in the RFQ.
- The Bidders/Suppliers may submit their own canvass form in accomplishing their bid proposals/quotations subject to the condition that the DA-BAC’s official canvass form shall be filled up (with the offered brand, unit price and total price), signed properly and attached together with the Bidder’s/Supplier’s own canvass form.
Please write legibly, non-compliance of which shall result to the automatic disqualification of proposal.
- Any specifications other than those required/stated in this form shall not be considered in the evaluation of bid.
- Quotation/s must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.
- Always indicate the brand name/model of the offered item(s) or product.
- Price quotation(s) submitted shall be valid for a period of THIRTY (30) days reckoned from the deadline for submission of quotations as reflected in the PhilGEPS.
- Terms of Payment within – Thirty (30) days from delivery of item/s.
- Quotation(s)/ Proposal(s) shall be submitted to the Office of the Procurement Division, at the 2nd Floor, ITCAF Building, Elliptical Road, Diliman Quezon City.
- Only sealed canvasses shall be considered by the BAC.
- The bidder is required to affix his/her signature across the flap of the sealed envelope, non-compliance of which shall result to the automatic disqualification of proposal.
- Awarding shall be done per LOT.
- DEADLINE FOR SUBMISSION OF BIDS: March 31, 2017 12:00 noon.
- Delivery Period: Seven (7) working days upon receipt of approved Purchase Order/Work Order.
- Effectivity Period: Upon Conforme of approved Purchase Order / Work Order.
- Availability of Stocks: 60 days reckoned from Instruction no.12.
- Mandatory Requirements: (Certified true copies of Valid Mayor’s Permit and BIR Certificate of Registration). The proposal shall be accompanied by the aforementioned documents, otherwise, non-submission of which shall result to automatic disqualification of proposal.
- The bidders shall reflect on the envelope the Solicitation no. and the PRAS No., the BAC shall not be responsible on the pre-emptive/premature opening of the proposal.
- Manufacturers, suppliers, distributors, contractors, and/or consultants are mandated to register with the PhilGEPS and provide a PhilGEPS Registration number as a condition for award of the contract.
PR NO. 17-008 ABC: P200,000.00 End-User: PERSONNEL DIVISION
Resolution No. Solicitation No. NP-041-17
Qty | Unit | ITEM/DESCRIPTION | UNIT
COST |
Offered Brand |
UNIT PRICE | TOTAL PRICE |
SUPPLY AND DELIVERY OF AIRCON INCLUDING INSTALLATION FOR USE OF PERSONNEL DIVISION | ||||||
2 | unit | 3HP Wall Mounted Inverter Type Refrigerant – 32. Including Installation and Fedder Line | P100,000.00 | |||
GRAND TOTAL | Php200,000.00 |
For the Bids and Awards Committee:
______________________ __________________________
PhilGEPS Posted ATTY. MELINDA D. DEYTO
Chief, Procurement Division
________________________
Canvasser
The DA Bids and Awards Committee (BAC)
Elliptical Rd., Diliman Quezon City
SIR/MADAM:
In connection with the above request, I/We submit your quotation indicated above. I/We have carefully read and fully understand the minimum requirements and agree to furnish and/or delivery in conformity with specifications any or all said articles described above within seven (7) working days from receipt of Purchase Order.
________________________ __________________ ______________________
Signature Over Printed Name Name of Company Tax Identification Number
_______________________ _____________________ _______________________
Telephone Number(s) Address Date Accomplished
Bank Details: | |
Name of Bank (Branch): | |
Account Name: | |
Account Number: |
E-mail Address of the Bidder: ______________________________ |