Masaganang Agrikultura, Maunlad na Ekonomiya!

NP-035-19: Bus Rental for the Conduct of ICTS Performance Review and Assessment on June 25-28, 2019 at Cordillera Administrative Region (CAR) (ICT Planning and Standards Division)

Author: DA-BAC | 16 April 2019

16   April 2019

 

REQUEST FOR QUOTATION

  1. NP-035-19

 

  1. MANDATORY REQUIREMENTS

 

  1. Submission of documentary requirements with mark “ü” as follows:

 

  Mayor’s/Business Permit
  Professional License/Curriculum Vitae (Consulting Services)
  Valid PhilGEPS Registration Number
  PCAB License (Infrastructure Projects)
  Income Tax/Business Tax Return (For ABCs above PhP500,000.00)
  Omnibus Sworn Statement (For ABCs above PhP50,000.00)
  Performance Security for Infrastructure Projects
  Warranty Security (For Goods and Infrastructure Projects)

 

NOTE: PhilGEPS Certificate of Platinum Membership may be submitted in lieu of Mayor’s

Permit and PhilGEPS Registration Number.

  1. The Bidders/Suppliers or their Authorized Representative shall accomplish this form including unit price and total price as well as sub-total and grand total (if applicable) and affix their signature over printed name indicated in the lower portion of this form.

 

  1. Please write legibly.

 

 

  1. INSTRUCTIONS:

 

  1. Open quotations may be submitted at the office address indicated below. In case of sealed quotation, the Bidders/Suppliers or their Authorized Representative shall indicated on the envelope the RFQ number and the name of bidder/supplier. Otherwise, the quotation shall be rejected.

 

  1. Any interlineations, erasures or overwriting shall be valid only if they are signed or initialed by the Bidders/Suppliers or their Authorized Representative.

 

  1. Quotation(s) must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.

 

  1. Price quotation(s) submitted shall be valid for a period of ONE HUNDRED TWENTY (120) days reckoned from the deadline for submissions of quotations as reflected in this form.

 

  1. Terms of Payment: Thirty (30) days from delivery of item(s).

 

  1. Quotation(s)/Proposal(s) shall be submitted to and received by the Office of the Procurement Division, at the 2nd Floor, ICTS Building, Elliptical Road, Diliman, Quezon City on or before the time and date stated in no.8.

 

  1. Awarding shall be done by LOT.

 

  1. DEADLINE FOR SUBMISSION OF BIDS: April 22, 2019 at 12:00 noon

 

  1. In case of two or more bidders are determined to have submitted the Lowest Calculated Quotation/Lowest Calculated and Responsive Quotation, the BAC shall employ “draw lots” as the tie-breaking method to finally determine the single winning provider in accordance with GPPB Circular No. 06-2005.

 

  1. Delivery and/or Installation Period: on the date of the activity.

 

  1. The Uniform Guidelines for Blacklisting set forth in Appendix 17 of the 2016 Revised IRR of RA 9184 shall apply in case any of the violations listed under Item Nos. 4.1 and 4.2 thereof is/are committed.

 

  1. The Department of Agriculture reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the affected bidder or bidders.

 

PRAS NO. 19-0887         ABC: PHP66,000.00           END-USER: ICT PLANNING  AND STANDARDS DIVISION

 

Mode of Procurement:  Negotiated (Small Value Procurement)

 

QTY UNIT ITEM/DESCRIPTION CEILING FOR BID PRICES

(PhP)

BID PRICE PER ITEM

(PhP)

TOTAL BID PRICE

(PhP)

    BUS RENTAL FOR THE CONDUCT OF ICTS PERFORMANCE REVIEW AND ASSESSMENT ON JUNE 25-28, 2019 AT CORDILLERA AUTONOMOUS REGION (CAR)      
1 unit Bus Rental (Air-Conditioned, Pick-up and Dropped Off,49 + 1 Sitting Capacity without Jumped Seat, Inclusive of Parking Fee and Fuel

June 25, 2019   6:00 AM   Pick-up at DA and Dropped –off to CAR (Baguio City)

 

June 28, 2019   10:00 AM  Pick-up CAR (Baguio City) and Dropped – off to DA Central Office Quezon City

66,000.00    
    TOTAL AMOUNT PhP66,000.00    

 

 

                                                                                          _____________________________

                                                                                                 ATTY. MICHAEL S. ANDAYOG

                                                                                                 Chairperson, BAC – Secretariat

 

 SIR/MADAM:

 

            In connection with the above requirement(s), I/We submit our quotation/proposal indicated above. I/We carefully read and fully understand the minimum requirements and agree to furnish and/or deliver the abovementioned requirement(s) in conformity with the specifications/terms of reference indicated/attached hereto.

 

 

 

 

Signature Over Printed Name

 

 

Name of Bidder

 

 

PhilGEPS Registration Number

 

 

Contact Number(s)

 

 

Office Address

 

 

Email Address of the Bidder

(Optional)

 

 

 

Terms of Payment:

 

Payment shall be made through Land Bank’s LDDAP-ADA/Bank Transfer. Bank Transfer Fee shall be charged against the creditor’s account.

 

Payment Details:

 

Banking Institution: _____________________________

 

aaAccount Number: _____________________________

 

aaAccount Name: _____________________________

 

a Branch: _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_____________________________

In lieu of the Mayor’s Permit, only the BIR Certificate shall be submitted by an individual supplier/contractor/ service provider.

 

Please see attached link for the signed Request for Quotation and Omnibus Sworn Statement

 

 

 

Back to Archives