Author: DA-BAC | 14 March 2022
Failure of bidding due Section 35.1.a of the 2016 RIRR of RA 9184.
a. no bids are received.
Failure of bidding due Section 35.1.a of the 2016 RIRR of RA 9184.
a. no bids are received.