Author: DA-BAC | 23 September 2020
This serves as notice to the public that the requirement: Replacement of Ceiling and Repainting, Installation of 3 pcs Plastic Door and 18 sets door knob, installation of common CR of Old Building for Official use of DA Main Building from 1st floor to 4th floor under PRAS 20-1327 – GSD was awarded to Houselink Construction Supplies Trading as the single calculated and responsive bidder through Negotiated Procurement (Shopping) with the total amount of Eighty Nine Thousand Six Hundred Five Pesos Only (PhP89,605.00)
Please see attached links for reference.