Masaganang Agrikultura, Maunlad na Ekonomiya!

NP-083-19 (2): Bus Rental for the Year-End Assessment Review of CY 2019 Audit Plan and Strategic Planning for CY 2020 on November 26-29, 2019 in Region IV-A

Author: DA-BAC | 13 November 2019

The Department of Agriculture, invites interested suppliers to submit quotations/proposals for the hereunder requirement:

November 12, 2019

REQUEST FOR QUOTATION

No. NP-083-19 2

 

 

  1. MANDATORY REQUIREMENTS
  2. Submission of documentary requirements with mark “ü” as follows:

ü Mayor’s /Business Permit [1]

ü PhilGEPS Registration Number

  1. The Bidders/Suppliers or their Authorized Representative shall accomplish this form including unit price and total price as well as sub-total and grand total (if applicable) and affix their signature over printed name indicated in the lower portion of this form.
  2. Please write

 

  1. INSTRUCTIONS:
  2. Only sealed canvass shall be considered by the BAC. The Bidders/Suppliers shall reflect on the envelope the RFQ Number and the PRAS No., the BAC shall not be responsible on the pre-emptive/premature opening of the proposal.
  3. Any interlineations, erasures, or overwriting shall be valid only if they are signed or initialed by the Bidders/Suppliers or their Authorized Representative.
  4. Quotation/s must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.
  5. Price quotation(s) submitted shall be valid for a period of ONE HUNDRED TWENTY (120) days reckoned from the deadline for submission of quotations as reflected in this form.
  6. Terms of Payment: Thirty (30) days from delivery of item(s).
  7. Quotation(s)/Proposal(s) shall be submitted at the Office of the Procurement Division, 2nd Floor, ICTS Building, Department of Agriculture – Central Office, Elliptical Road, Diliman, Quezon City.
  8. Awarding shall be done by
  9. DEADLINE FOR SUBMISSION OF BIDS: November 18, 2019 at 12:00 noon.
  10. In case of two or more bidders are determined to have submitted the Lowest Calculated Quotation/Lowest Calculated and Responsive Quotation or Highest Rated and Responsive Quotation for consultancy services, the DA-BAC shall employ “draw lots” as the tie-breaking method to finally determine the single winning provider in accordance with GPPB Circular 06-2005.
  11. Delivery and/or Installation Period: on the date of activity
  12. The Uniform Guidelines for Blacklisting set forth in Appendix 17 of the 2016 Revised IRR of RA 9184 shall apply in case any of the violations listed under Items 4.1 and 4.2 thereof is/are committed without prejudice for forfeiture of performance security.
  13. The Department of Agriculture reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the affected bidder or bidders.
  14. Submission of Omnibus Sworn Statement (for ABC’s above PhP50,000.00) will be prior to payment by the winning bidder.

 

PRAS No. 19-1765                                             ABC: PhP55,000.00                          End-User: IAS                                                                       Mode of Procurement: Small Value Procurement (SVP)

Qty. Unit ITEM/DESCRIPTION CEILING FOR TOTAL PRICES (PhP) UNIT PRICE (PhP) TOTAL PRICE (PhP)
    Bus Rental for the Year-End Assessment Review of CY 2019 Audit Plan and Strategic Planning for CY 2020 on November 26-29, 2019 in Region IV-A      
1 unit Transportation

1 unit Bus Rental – 25 seaters

November 26, 2019 – pick-up from DA-Central Office, drop to Region IV-A

November 29, 2019 – pick up from Region IV-A to DA Central Office

Includes petroleum oil, lubricant, toll fees, driver’s fee and parking fees

PhP55,000.00    

 

 

 

ATTY. MELINDA D. DEYTO

Chief, Procurement Division

 

 

PRAS No. 19-1765                                             ABC: PhP55,000.00                          End-User: IAS                                                                        Mode of Procurement: Small Value Procurement (SVP)

 

DA Bids and Awards Committee (BAC)

Elliptical Road, Diliman, Quezon City

 

 

SIR/MADAM:

 

            In connection with the above requirement(s), I/We submit our quotation/proposal indicated above. I/We carefully read and fully understand the minimum requirements and agree to furnish and/or deliver the above mentioned requirement(s) in conformity with the specifications/terms or reference/scope of work indicated/attached thereto.

 

 

 

 

 

_________________________

Signature Over Printed Name

 

_________________________

Name of the Bidder

 

 

_________________________

PhilGEPS Registration Number

 

 

_________________________

Contact Number(s)

_________________________

Office Address

 

_________________________

Email Address of the Bidder (Optional)

 

 

Terms of Payment:

 

Payment shall be made through Land Bank’s LDDAP-ADA/Bank Transfer, Bank Transfer fee shall be charged against the creditor’s account.

 

 

 

Payment Details:

 

Banking Institution: __________________________________________

 

Account Number: ___________________________________________

 

Account Name: _____________________________________________

 

Branch: __________________________________________________

PLEASE SEE ATTACHED DOCUMENTS:

https://drive.google.com/open?id=1aCXWRWJLG-Fo7WD5LDXfQIlwPoN0LCBD

https://drive.google.com/open?id=1Qim83ktEclNK00XQDKy7zwoUo7LO4p7r

Back to Archives